Sunday, April 17, 2011
Hibbing Taconite Project Wrap-Up
After mulitple meetings with the engineers and mechanics, we have narrowed our design down to hydraulics. The team has been working to complete two different mounting designs for the hydraulic system for installation. When the designs are finished and our price estimates are complete, we will then present our final work to Hibbing Taconite. We are nearing completion, even though we planned on having our final deliverable done by Friday, April 15th. We set our finish date early so that if we ran into issues or had delays, we could still finish before the end of the semester. Also, we set our end date sooner so that Hibbing Taconite could install the lift system as soon as possible because they are ready to get it installed. We should have it ready by the end of this week. Proof read by: Matt Hudson