Yesterday, our second prototype for the Power Trowel Solution Applicator was completed. After implementing many of the suggested changes including tank design, spray nozzles, mounting setup, and increased volume capacity, a workable design was built. The design better protects the hose and electrical parts from damage during transport and use.
We installed the prototype on the trowel this morning and are now waiting for an opportunity to test it on a poured slab. This will come sometime next week. If all goes well there will be minor modifications necessary for a sellable product. In addition, next week the teams advancing to the 3rd round of the Minnesota cup will be announced.