This summer there is a remodeling project at Mesabi Range to provide IRE with a much larger student office space and clean lab. This past year, with only 14 students, we were able to get by in our little corner of the campus. The great part was we had sufficient space for design. The bad news was we didn't have a place to put engineering laboratory equipment. Next year that all changes. Our clean lab will house lots of equipment and we will have excellent space for the returning generation one students and our new class - generation 2. Nick has been hard at work with architects to get everything done right and on time.
P.S. Today the power trowel group gave me a demonstration of their project -- making lots of progress!!
No comments:
Post a Comment